Skatepark at Mold-Masters SportsPlex

Share on Facebook Share on Twitter Share on Linkedin Email this link

We're replacing the skatepark at Mold-Masters Sportsplex with a new community-sized skatepark, and we want your help to design it!

The Town of Halton Hills is working with New Line Skateparks to bring a new and improved skatepark to the Mold-Masters SportsPlex at 221 Guelph Street in Georgetown. We are looking for your input to shape the design of the new park.

The consultation will take place in three stages beginning with a design input. Please take a few minutes to complete the survey below.

New Line Skateparks has developed concept designs based on the initial input. An online workshop will take place Nov 24 to solicit feedback. A follow up survey to provide comment if you are unable to attend will be open until Dec 1.

Based on the feedback, the design will be refined into a final concept which will then be presented at a design workshop in January.

Over the winter the design will be finalized and detailed construction drawings developed.

Pending 2022 Capital Budget approval, construction would start in the spring with completion anticipated in summer 2022.


Stay Tuned for more information!


We're replacing the skatepark at Mold-Masters Sportsplex with a new community-sized skatepark, and we want your help to design it!

The Town of Halton Hills is working with New Line Skateparks to bring a new and improved skatepark to the Mold-Masters SportsPlex at 221 Guelph Street in Georgetown. We are looking for your input to shape the design of the new park.

The consultation will take place in three stages beginning with a design input. Please take a few minutes to complete the survey below.

New Line Skateparks has developed concept designs based on the initial input. An online workshop will take place Nov 24 to solicit feedback. A follow up survey to provide comment if you are unable to attend will be open until Dec 1.

Based on the feedback, the design will be refined into a final concept which will then be presented at a design workshop in January.

Over the winter the design will be finalized and detailed construction drawings developed.

Pending 2022 Capital Budget approval, construction would start in the spring with completion anticipated in summer 2022.


Stay Tuned for more information!


  • CLOSED: This survey has concluded.

    The terrain preferences and general user information survey is now closed.  New Line Skateparks and Town staff will review the findings and develop concepts for further public consultation.  These will be presented at a virtual workshop Nov. 24.  Please pre-register for that workshop on this page.  

    Take Survey
    Share on Facebook Share on Twitter Share on Linkedin Email this link
  • Based on directions from the initial online terrain survey, New Line Skateparks has developed three concepts (design directions) for consideration for the replacement of the skatepark at Mold-Masters SportsPlex.  These were presented during a virtual public workshop on November 24, 2021.  If you were unable to attend, or wish to provide more feedback on the project, please complete this survey by December 1, 2021.  Comments will be reviewed by Town staff and New Line Skateparks and taken into consideration as the concept design is finalized.  A final concept will be presented at a workshop in January.

    Complete Form
    Share on Facebook Share on Twitter Share on Linkedin Email this link